The system commissioning plan is intended to confirm that the proposed ECMs have been installed according to manufacturers’ guidelines and that the system will perform as expected. Contractors are required to prepare a commissioning report and submit it to the owner and the program administrator. It should include as-built drawings, O&M manuals for each ECM, and a narrative appropriate for the size and complexity of the project.